Baby

Musical Essay | 2022
Director | Cinematographer | Editor-Colourist
Original Track by DakhaBrakha
WATCH THE FILM

Watch The Film

Skip Gallery

A CUBEROSE Production

ABOUT The Film

'Baby', is a very unplanned & spontaneous work that weaves my scattered, chaotic and aimless documentation of a time, spanning across 2 years, in a musical thread. The original idea of the shoot was to explore and capture images in and around places, I call home, for a feature length documentary, which could not be completed for circumstantial reasons. Around the time, I happened to come across this composition - "Baby" from the Ukrainian Band 'DakhaBrakha'.

Baby (Original Album - Light | 2010) moved me so much at the time, that I edited this musical essay using the shots of a dead film. Never felt this alive before!

Shot, Edited & Directed by  UTTARAN DE

Shot, Edited & Directed by UTTARAN DE

VFX & Colour Grade -  UTTARAN DE

Shooting Assistance -  SRIJAN CHAKRABORTY

VFX & Colour Grade - UTTARAN DE

Shooting Assistance -  SRIJAN CHAKRABORTY

CAST

RIMJHIM CHATTORAJ | SAMARPAN DE | SOBUJ & NEELESH (THE CATS)

RIMJHIM CHATTORAJ | SAMARPAN DE | SOBUJ (THE CAT)